A cloud kitchen equipment layout in Singapore should follow one direction of travel: receiving, storage, preparation, cooking, packing and dispatch, with washing on a separate route. Equipment is then placed to serve that sequence, and spaced to meet Singapore Food Agency (SFA) licensing conditions. This guide sets out the zones, the placement of each equipment type, the clearances that apply, the utility checks to make before signing a lease, and how energy-efficient equipment fits into the plan.
TL;DR
- Arrange the kitchen as a one-way flow: receiving, storage, preparation, cooking, packing, dispatch. Keep washing on a route that does not cross the food line.
- Choose equipment after the menu and peak-hour order volume are fixed. The menu decides the cooking line, and the volume decides the size and number of units.
- SFA licensing conditions require separate work areas with minimal criss-crossing, labelled storage areas and defined spacing between equipment unless it is sealed to the wall.
- Check exhaust, grease trap, drainage and incoming power for the unit before signing a tenancy.
- Induction cooking hobs and inverter refrigerators fall within the categories described in the Energy Efficiency Grant (EEG) FAQ. Confirm the current grant status before ordering.
Table of Contents
- Start with the menu and peak order volume
- The six-stage workflow
- Where each equipment type belongs
- Spacing, surfaces and sinks required by SFA
- Layout types for different sites and menus
- Check the unit before signing the lease
- Energy-efficient equipment in the layout
- Perspective
- Plan your equipment with us
- FAQ
- Sources
Start with the menu and peak order volume
A layout drawn before the menu is fixed usually has to be redrawn. A wok-heavy menu, a grill menu and a bakery need very different equipment lines, so the first document to prepare is a list of dishes with the expected number of orders in the busiest hour.
A practical sizing method has four steps:
- Estimate the number of orders in the peak hour for each brand.
- Record the preparation time and cooking time of each dish.
- Work backwards to the capacity each cooking appliance must deliver per hour. Restroworks gives an example in which a combi oven handling four trays at 15 minutes each produces roughly 16 batches an hour.
- Where the figures fall between two sizes, take the larger size for the cooking line.
The result is an equipment schedule. It should list each appliance with its footprint, its power load, whether it needs a water or drain connection, and whether it needs to sit under the exhaust hood. The layout is drawn from this schedule, not the other way round.
The six-stage workflow
SFA’s Conditions of Licensing for Food Establishments require separate work areas with a smooth, straight workflow and minimal criss-crossing or back-tracking, to limit cross-contamination. The same document requires separately labelled storage areas for raw materials, final products, chilled products, frozen products, packaging materials and cleaning equipment, managed on a First-In-First-Out basis.
For a delivery-only kitchen, this translates into the following sequence.
- Receiving. Goods enter near the back entrance or loading point and go directly to storage. They do not pass through the cooking area.
- Storage. Dry racks, chillers and freezers sit close to receiving. Raw, cooked, chilled, frozen and packaging stock are kept in separately labelled areas.
- Preparation. Prep tables sit between storage and cooking, so ingredients travel a short distance in one direction.
- Cooking. The cooking line sits under the exhaust hood. The busiest station is placed nearest the packing area.
- Packing and dispatch. The pass faces the delivery handover. Riders collect from a counter or window and do not enter the production area.
- Warewashing. Dirty items return to a dish area separate from preparation and cooking, along a route that does not cross the pass.
The packing and dispatch stage is what separates a cloud kitchen from a restaurant. There is no dining room, so the pass is the end of the line, and its position decides how far finished food travels while it is still hot.
Where each equipment type belongs
The table below links each equipment group to a zone and a placement rule. The rules are standard layout practice combined with the SFA conditions above.
| Zone | Equipment | Placement guidance |
|---|---|---|
| Receiving and storage | Stainless steel racks, chillers, freezers | Close to the entrance. Keep chilled and frozen stock separate from dry goods and label each area. |
| Preparation | Stainless steel worktables, prep sinks, dough mixers, blenders | Between storage and cooking. Keep raw food areas apart from cooked food areas. |
| Cooking | Induction cookers, deep fryers, ovens, hot plates, grillers, noodle and soup boilers | Under the hood. Place the highest-volume station nearest the pass. Keep ovens away from cold and dessert stations. |
| Holding | Food warmers, rice warmers, steamers | Between the cooking line and the pass, so food leaves quickly. |
| Packing | Packing tables, sealers, drinks and hot water dispensers | Next to the pass. Fryers sit near the packing area because fried food loses quality quickly. |
| Warewashing | Sinks, drying racks, cabinets | Separate from food preparation. Waste and dirty items never cross the packing area. |
Two placement habits reduce congestion. First, place refrigeration close to preparation counters, so staff do not walk across the kitchen for ingredients. Second, put equipment shared by several brands, such as a steamer or a blender, in a central position reachable from each station.
For product categories such as refrigeration, ovens, induction cookers, fryers, warmers and stainless steel furniture, see the commercial kitchen equipment range available in Singapore.
Spacing, surfaces and sinks required by SFA
The SFA licensing conditions set several rules that affect where equipment can physically stand:
- All equipment must be mounted at least 91 cm from the wall, and at least 91 cm must be allowed between pieces of equipment, unless the equipment is sealed against the wall by caulking.
- All surfaces in contact with food must be inert, non-toxic, smooth and non-porous. Wooden worktops and shelves are therefore unsuitable for food contact.
These two rules explain why stainless steel worktables, sinks and racks form the base of most commercial kitchen layouts. Sealing equipment to the wall also allows a tighter plan in a small unit, because the 91 cm gap no longer applies to that side.
For sinks, the layout plan should show a hand wash basin with soap, ideally with a sensor tap, a preparation sink for raw ingredients, and a separate wash-up sink in the dish area. Where raw meat and vegetables are both handled, two preparation sinks make separation easier. Place the hand wash basin where staff pass before entering the preparation area.

The SFA’s food shop checklist, as summarised by industry sources, also asks that the layout plan submitted for a licence show kitchen equipment and infrastructure such as exhausts, sinks and wash basins. Draw the equipment schedule into the plan accurately, because a layout that changes after submission may not match the approved plan. Confirm the current requirements and minimum kitchen area for your licence type directly with SFA.
Layout types for different sites and menus
Commercial kitchens generally use one of a few arrangements. Two suit cloud kitchens best.
Assembly line. Stations are placed in a row in the order of production. This works for high volumes and limited menus, such as a single-concept rice bowl or fried chicken brand. Each station repeats one task, and the pass sits at the end.
Zone or station layout. The kitchen is divided into fryer, wok, grill, cold and pastry stations, each with its own equipment. This suits a varied menu or several brands in one kitchen, provided shared equipment is positioned centrally.
Galley. Two parallel runs of equipment with a narrow walkway between them. This is common in compact units and shophouse spaces. It uses a small footprint well, but the walkway must remain clear of crossing traffic, so the packing area should be at one end and washing at the other.
Site size varies widely. In 2020, Grab described a shared kitchen of 2,971 square feet in Aljunied with eight kitchens and more than 15 brands, which shows how many concepts a shared facility can host. A single operator in a small unit has a simpler task: one flow, one hood, one pass.
For multi-brand operations, a few rules keep the layout workable:
- Give each brand its own preparation surface and cooking station, to keep ingredients, allergens and recipes apart.
- Share high-cost items that are used intermittently, such as ovens, steamers, chillers and the dish area.
- Use one packing area with clearly labelled lanes for each brand, so orders are not mixed.
- Keep dispatch separate from the production floor, so riders from different platforms do not enter the kitchen.
Check the unit before signing the lease
Not every commercial unit can support a full kitchen. The layout depends on infrastructure that the tenant often cannot change, so assess the following before signing a tenancy:
- Exhaust. Is there an existing exhaust riser or a permitted duct route to discharge outdoors? The SFA conditions refer to cooking fumes being extracted, treated by an air cleaning system and discharged outdoors, at or above roof level where practical. Our guide to kitchen ventilation requirements in Singapore covers the NEA and SCDF rules in more detail.
- Grease trap and drainage. Sinks, dishwashers, combi ovens and ice machines should be near drainage. A floor trap should serve the food preparation area.
- Power. Add the peak load of every appliance on the equipment schedule and compare it with the incoming supply. Induction cookers, ovens and fryers draw heavily.
- Fire safety. Cooking lines need suppression and compliant clearances. See our summary of SCDF kitchen fire safety rules.
- Heat. Singapore kitchens run hot. Planning spot cooling or make-up air near the cooking line helps staff comfort. For measures that reduce the load, see engineering measures to cut kitchen heat loads.
If the equipment schedule and the unit do not match, the cooking line has to change. It is cheaper to change the menu or choose another unit before fit-out than to rework exhaust and power afterwards.
For help with the physical arrangement of a commercial kitchen, see our page on interior designing for commercial kitchen setups.
Energy-efficient equipment in the layout
Equipment choice affects the layout through heat, ventilation and power. Induction cookers release less heat into the room than gas hobs, which reduces the cooling and extraction load around the cooking line. Efficient refrigeration lowers the heat released near storage and prep.
Enterprise Singapore’s Energy Efficiency Grant FAQ describes support of up to 70% for eligible local SMEs in the Food Services, Food Manufacturing and Retail sectors. It lists pre-approved categories including cooking hobs using induction technology, commercial refrigerators with inverter technology and heat pump water heaters, with a cap of S$30,000 per company per year. The FAQ also states that equipment is identified by technologies regarded as energy efficient, such as induction compared with gas or ceramic hobs, or by high ratings under NEA’s Mandatory Energy Labelling Scheme.
The grant scheme, its funding tiers and its application periods change over time, and the FAQ cited here carries its own dates. Before ordering, confirm the current status with Enterprise Singapore, and apply before purchase or installation where the scheme requires it. Our article on the EDGE grant and kitchen equipment in 2026 explains how the schemes relate, and the guide to EEG-ready procurement lists what to prepare. To estimate payback, see kitchen equipment ROI with EEG co-funding.
Perspective
We see most layout problems begin with the equipment list, not with the floor plan. A cloud kitchen has no dining room to absorb mistakes, so every appliance has to earn its place in the flow from storage to pass.
Our approach is to settle three items together: the menu, the electrical load and the cooking technology. Induction cookers, inverter refrigerators and other energy-efficient models are part of our range because they affect heat, ventilation and monthly electricity cost, and several fall within categories the Energy Efficiency Grant has covered for eligible Singapore businesses.
We state our own estimate that energy-efficient equipment can reduce electricity bills by up to 40%, and that eligible businesses may claim grants of up to 70% of the original cost. Eligibility depends on the company and on the scheme in force at the time of application, so we guide customers through the requirements before they order.
Operators are welcome to visit our showroom to see the appliances, check dimensions against their floor plan and discuss which units suit their menu.
David
Plan your equipment with us
Superior Kitchen Equipment supplies commercial refrigerators, chillers and freezers, ovens and dough mixers, induction cookers, deep fryers, noodle and soup boilers, food warmers, stainless steel tables, sinks, cabinets and racks, drinks dispensers, hot plates and grillers for Singapore food businesses. We also provide guidance on claiming government energy efficiency grants.
Bring your menu, your unit dimensions and your equipment schedule, and we can match them to products in the range. Browse the full equipment collections or visit the Superior Kitchen Equipment website to arrange a showroom visit.
FAQ
What is the best cloud kitchen layout for a small unit?
A galley or assembly-line arrangement usually suits a small unit. Place receiving and storage at one end, the cooking line under the hood in the middle and the pass at the other end, with washing on a separate route. This keeps a single direction of travel in a narrow space.
What equipment does a cloud kitchen need?
The core list is cooking equipment matched to the menu, refrigeration and freezers, stainless steel worktables and shelving, sinks and a hand wash basin, exhaust and ventilation, cleaning equipment and packing equipment. The menu decides the cooking appliances, and peak-hour order volume decides their size and number.
How far must equipment be from the wall in Singapore?
The SFA licensing conditions require equipment to be mounted at least 91 cm from the wall, with at least 91 cm between pieces of equipment, unless the equipment is sealed against the wall by caulking. Confirm the current conditions for your licence type with SFA before finalising the plan.
Can a cloud kitchen claim a grant for energy-efficient equipment?
Enterprise Singapore’s Energy Efficiency Grant has covered categories such as induction cooking hobs and inverter refrigerators for eligible local SMEs in food services, at up to 70% support within a per-company cap. Schemes and application periods change, so check the current terms with Enterprise Singapore and apply before purchase if required.
Should I choose equipment before or after the layout?
Choose the equipment schedule first, at least in outline. The layout depends on appliance footprints, power loads, drain connections and hood coverage. Once the schedule is fixed, draw the plan and show the equipment, exhaust, sinks and wash basins on it.
Sources
- SFA Conditions of Licensing for Food Establishments
- Enterprise Singapore Energy Efficiency Grant FAQ
- Grab Singapore press release on GrabKitchen Aljunied
- Restroworks cloud kitchen equipment guide